Increasing the bearing capacity and settlement reduction of P3 & P4 container wharf/ Mahshahr Port

Project type

Harbor

Improvement plan

Increasing the bearing capacity, settlement reduction and Preventing the flow into the dock by  Implementation of overall of  jet grouting column length of 14000 meters with 1m diameter and maximum individual column length of 22 meters.

Technology

Jet Grouting

Project location

Mahshahr, Khuzestan